Trying to cool off by dunking my head in the wheel barrow filled with water.
The walk and porch turned out really awesome.
It took about 3 1/2 yards of concrete and 30 or so min to pour. Soooo grateful that Jon and Boyd were here.
After 5 truck loads of gravel (by hand), $100 of rebar, releveling the forms, we were ready.

No comments:
Post a Comment