All done with the grouting and installed 30% of the baseboards. Also moved the stove and fridge back in....yipeee! Now we can have hot meals again.
The grout we used was actually an epoxy grout so it never needs to be sealed and stain and waterproof. However, it will not fully cure until after 1 week. It says light traffic is possible after 18 hours.
Really glad that no tiles have cracked or broken.
Got half-way way through grouting and was debating to wait for the next day but we trudged through and finished it that evening. I was really tired. The epoxy grout only had about 15 min work-time before it got too hard to mess with.
Finished grouting the first half of the eating area. Already really tired.